Completed project · Simi Valley

Full water service
line replacement

A new copper supply from the meter to the home, with the work carried through to backfill and cleanup.

Stellar Sewers Coastal Plumbing completed a full fresh-water service line replacement at a Simi Valley home. The project covered approximately 45 feet of 1-inch piping between the street-side water meter and the exterior supply manifold.

Request service for your home →
Completed exterior copper water service connection with shutoff valves and pressure regulator at the Simi Valley home.
Completed supply connection at the home.

From the meter to the house

The replacement route passed through the front lawn and beneath the sidewalk and decorative brick walkway. The installation photos show the new copper piping in the open trench and the completed connection beside the home.

The exterior assembly includes the copper supply connections, shutoff valves and pressure regulator shown in the project photos. The work took two days, followed by a final cleanup the next morning.

Project details

Location
Simi Valley, California
Work completed
Full fresh-water service line replacement
Piping
Approximately 45 feet of 1-inch copper
Route
Water meter to exterior supply manifold

Finishing the work around the line

After the replacement, the excavated areas were backfilled and compacted. The grass was patched and the disturbed ground was settled. The sidewalk, brickwork, driveway, curb and street were washed down.

The completion photographs show the yard immediately after backfill and grass patching. They also show the cleaned hardscape and the finished exterior supply connection.

About this project

What did the water service replacement include?

The project replaced the full fresh-water service line from the meter to the home’s exterior manifold, using approximately 45 feet of 1-inch copper piping. It included the below-walkway portion of the route, the supply connection, backfill, compaction, grass patching and cleanup.

How long did this Simi Valley project take?

The installation took two days. The crew returned the following morning to finish the cleanup.

What happened to the yard and walkways?

The crew backfilled and compacted the excavated route, patched the grass and washed down the sidewalk, brickwork, driveway, curb and street.